DRDO’s Short Span Bridging System-10 m Inducted Into Indian Army
The SSBS-10 m plays a crucial role of bridging the gaps up to 9.5 m as a single span providing a 4 m wide, fully decked roadway, ensuring faster movement of the troops. Research & Development Establishment (Engrs) Pune, a premier engineering laboratory of DRDO, has designed and developed the system in association with M/s L&T Ltd. The 12 bridges are part of 102 SSBS-10 m from M/s L&T Ltd, which is the production agency.