Kautilya

Adani Green Accelerates India’s Clean Energy Push with Record 5 GW Capacity Addition in FY26

A large part of this fresh capacity has come up at the Khavda renewable energy park in Gujarat, which is steadily emerging as one of the most ambitious clean-energy projects in the world. IBEF reports that Adani Green has already installed 9,413 MW at Khavda out of a planned 30 GW by 2029, a pace that reflects growing execution confidence in mega-scale renewable infrastructure.

Digital Tolling Gets Teeth: NHAI Brings E-Notices, Double Fee Rule and VAHAN-Linked Enforcement

According to the PIB note, plaza-level assessments found that cash payments contribute to congestion, longer waiting times during peak traffic periods, and transaction-related disputes. A digital-only system, in contrast, allows toll plazas to process vehicles faster and with fewer manual interventions. Government messaging on FASTag over the past few years has consistently pushed the same direction: smoother traffic flow, lower friction at plazas, and a more technology-driven highway network.

HAL Penalises GE Aerospace As Engine Delays Stall Tejas MK-1A Deliveries

What has changed now is HAL’s response. Instead of treating the delay as a generic supply-chain inconvenience, the company has begun imposing liquidated damages or penalty clauses on GE for each delayed engine, according to multiple reports. That signals a harder contractual line from the Indian side and reflects growing frustration within the defence establishment over slippages in a programme that is central to both IAF force regeneration and the wider Aatmanirbhar Bharat aerospace narrative.

Categories