Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.NTPC’s Karsada plant located at Varanasi, has been able to achieve full load generation, and is running optimally at 214.3kW. Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.
Complementing environment conservation with technological innovation, the municipal solid waste supplied by the Varanasi Municipal Corporation is converted to electric power, thus ensuring scientific disposal of waste through a sustainable and environmentally friendly process.
NTPC has already signed a Power Purchase Agreement (PPA) with Purvanchal Vidyut Vitaran Nigam Limited (PuVVNL) of UP for evacuation of electric power generated at this waste-to-energy plant.
The project is also in line with the government’s Swachh Bharat Mission (SBM), promoting a healthy environment through proper waste utilisation. The compost created as a by-product is also sold as organic fertilizers to the farmers. The plant is being run by a MSME entity, in line with the government’s effort to promote small businesses, supplemented by the Make in India campaign.
Source: CWO
Image Courtesy: CW
You may also like
-
India’s Creator Economy Enters Its Formal Age as Influencer Marketing Heads Toward US$529 Million by 2027
-
GMR Aero Technic–Boeing Pact Puts Hyderabad on India’s Defence MRO Map
-
India’s $20 Billion Offshore Data Push Could Redefine Domestic Oil and Gas Exploration
-
India’s Steel Engine Defies Global Slowdown as Output Surges in FY26
-
India Launches IP Catalyst Platform to Turn Patents into Market-Ready Electronics and IT Products