Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.NTPC’s Karsada plant located at Varanasi, has been able to achieve full load generation, and is running optimally at 214.3kW. Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.
Complementing environment conservation with technological innovation, the municipal solid waste supplied by the Varanasi Municipal Corporation is converted to electric power, thus ensuring scientific disposal of waste through a sustainable and environmentally friendly process.
NTPC has already signed a Power Purchase Agreement (PPA) with Purvanchal Vidyut Vitaran Nigam Limited (PuVVNL) of UP for evacuation of electric power generated at this waste-to-energy plant.
The project is also in line with the government’s Swachh Bharat Mission (SBM), promoting a healthy environment through proper waste utilisation. The compost created as a by-product is also sold as organic fertilizers to the farmers. The plant is being run by a MSME entity, in line with the government’s effort to promote small businesses, supplemented by the Make in India campaign.
Source: CWO
Image Courtesy: CW
You may also like
-
Voltas and Atomberg Sign ₹200 Crore Joint Venture Agreement for Indigenous AC Compressors
-
Rossell Techsys Secures ₹50 Crore-Plus Overseas Order for Satellite Electrical Systems
-
India’s Core Industries Grow 10.9% in October, Led by Iron Ore, Coal and Power
-
US Naval Supply Ship Arrives at L&T Kattupalli Shipyard for Repairs
-
India and Russia Explore Expanded Cargo Shipping Through Northern Sea Route