Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.NTPC’s Karsada plant located at Varanasi, has been able to achieve full load generation, and is running optimally at 214.3kW. Set up with an installed capacity of 200kW, the thermal gasification based pilot scale 24 tonnes per day waste to energy plant has achieved full generation capacity.
Complementing environment conservation with technological innovation, the municipal solid waste supplied by the Varanasi Municipal Corporation is converted to electric power, thus ensuring scientific disposal of waste through a sustainable and environmentally friendly process.
NTPC has already signed a Power Purchase Agreement (PPA) with Purvanchal Vidyut Vitaran Nigam Limited (PuVVNL) of UP for evacuation of electric power generated at this waste-to-energy plant.
The project is also in line with the government’s Swachh Bharat Mission (SBM), promoting a healthy environment through proper waste utilisation. The compost created as a by-product is also sold as organic fertilizers to the farmers. The plant is being run by a MSME entity, in line with the government’s effort to promote small businesses, supplemented by the Make in India campaign.
Source: CWO
Image Courtesy: CW
You may also like
-
India’s Extreme Poverty Rate Falls from 27.1% to 2.6% Between 2011 and 2023: World Bank
-
Indian SpaceTech Company Pixxel Establishes US Subsidiary to Expand Defence and Satellite Intelligence Business
-
PI Industries Unveils India’s First Indigenously Discovered Insecticide Molecule Pioxaniliprole
-
Sun Pharma Secures US FDA Approval for ILUMYA to Treat Active Psoriatic Arthritis
-
India Expands UPI Payments for Online Tourist Bookings at Burj Khalifa and Singapore’s Resorts World Sentosa