NNTPC Ltd has informed to the exchanges regarding completion of trial operation by 660 MW capacity unit of Barh Super Thermal Power Project.
The Company said in a regulatory filing, “In line with the Corporate Disclosure requirements, it is informed that based on achievement of approved norms and due approvals, Unit-1 of 660 MW capacity of Barh Super Thermal Power Project-Stage-I, (3 x 660 MW) has successfully completed trial operation and consequently included in the installed capacity of NTPC Limited.”
With this, the total installed capacity of NTPC Limited and NTPC group has become 54232.5 MW and 67657.5 MW respectively, it added.
Source:Equity Bulls
You may also like
-
Railways Clears ₹448-Crore Traction Upgrade for Key South India Routes
-
India’s Solar Rise: From 2.8 GW to 155 GW, a Clean Energy Revolution Powers the Nation
-
PM Surya Ghar Pushes India’s Rooftop Solar Mission Towards 75 Lakh Homes by December 2026
-
India Overtakes the US in Solar Capacity Additions, Becomes the World’s Second-Largest Solar Growth Market
-
Maharashtra Tunnel Breakthrough Pushes India’s Bullet Train Project Into Faster Construction Momentum