Ministry of Road Transport and Highways has surpassed its target for construction of National Highways in the country till the past weekend. During April to August this year, 3181 kilometre NH length was constructed against the target of 2771 kms for this period. This includes 2104 kms by State PWDs, 879 kms by NHAI, and 198 kms by NHIDCL.
Further, 3300 km length of NH works have been awarded in this year till August, which is more than double of the 1367 kms during the same period last year. This includes 2167 kms of NH by PWDs, 793 kms by NHAI, and 341 kms by NHIDCL.
Sanctions were issued for construction of 2983 kilometres of NHs all over the country during this period. This includes 1265 kms by PWDs, 1183 kms by NHAI, and 535 kms by NHIDCL.
Source: PIB
You may also like
-
Dot Simplifies Approval Processes For Telecom Licenses And Wireless Equipment
-
PM to Inaugurate SEMICON India 2024 on 11th September
-
Shri Piyush Goyal Sets 500 Million Tonnes Domestic Steel Production Target by 2034
-
NHAI to Track Around 100 Toll Plazas with GIS-Based Software for Seamless Movement of Traffic at National Highways
-
“Marching Towards Building A Digitally Connected Bharat and An Atmanirbhar Telecom Sector”: Union Minister Jyotiraditya Scindia