In keeping with the initiative of Govt of India to promote Solar Power and objective to achieve 100 GW of solar power by 2022 as part of the National Solar Mission, a 2 MW Solar Photovoltaic Plant was commissioned at INS Kalinga, Visakhapatnam by Vice Adm Atul Kumar Jain, PVSM, AVSM, VSM, Flag Officer Commanding-in-Chief, ENC on 28 May 2020.
he plant, which is the largest in the ENC and has an estimated life of 25 years. Despite the lockdown, all concerned agencies including APEPDCL worked out a contingency plan adhering to all guidelines promulgated for Coronavirus pandemic and executed the work.
Speaking on the occasion, Vice Adm Atul Kumar Jain stated that the commissioning of this plant demonstrates the commitment of Eastern Naval Command towards conservation of the environment and eco-friendly measures.
INS Kalinga, currently headed by Cmde Rajesh Debnath, has taken significant strides in Green Initiatives since it’s setting up in the early 1980s, including afforestation, numerous plantation drives, coastal cleanup drives and protection of the Geo-Heritage site “Erra Matti Dibbalu”.
Source : PIB
Image Courtesy: PIB
You may also like
-
US Naval Supply Ship Arrives at L&T Kattupalli Shipyard for Repairs
-
Indian Navy Receives Indigenous Diving Support Craft DSC A21 Built by Titagarh Rail Systems
-
Sarus Aerospace Demonstrates Indigenous Shaurya VTOL Drone’s High-Altitude Capabilities at Tawang
-
Prime Industries Partners with Wahi Sons to Expand Precision Engineering and Defence Manufacturing Capabilities
-
DRDO and Japan’s ATLA to Advance Joint Research in Advanced Missile and Defence Technologies