Infrastructure

Indian Infrastructures and Capabilities

Months After Cancelling Deal with China, India Acquires Heavy Cranes for Chabahar Port

Following a fresh tender for cranes with 65-tonne capacity, the equipment was procured from a Western company and is now expected to reach Chabahar by next month, people familiar with developments said on condition of anonymity. They declined to give further details in view of sensitivities linked to US sanctions on Iran, though Chabahar port has been granted a waiver.

Indian Railways’ First Cable-Stayed Anji Rail Bridge

The Anji Khad Bridge stands at a height of 331 metres above the river bed. The total length of the bridge is 473.25 metres. It has been designed to handle heavy storms of strong winds due to the high altutide. The geology of the region is extremely complex, making it impossible for an arch bridge to be constructed. Due to this, the bridge has a single pylon. The pylon had to be constructed on a vertical slope by using micropiles of 40 metres in depth.