Infrastructure

Indian Infrastructures and Capabilities

Rohtang Tunnel Likely to Become Operational by May 2020

Once inaugurated, this tunnel will become one of the longest road tunnels in the country, being built at an elevation of 10171 ft under the Rohtang Pass. And with the opening of this tunnel, it will reduce the distance between Lahaul-Spiti’s administrative centre Keylong and Manaliby around 45 km. This will also help the Leh-Manali highway to remain open to traffic even during winters, thereby benefitting residents of Himachal Pradesh’s tribal district Lahaul-Spiti and newly the formed union territory, i.e., Ladakh.

Dalmia-OCL Sets Up Integrated Snorkel Manufacturing Line at Rajgangpur, Odisha

With an annual capacity to manufacture 240 sets, the new Snorkel Manufacturing line features high-accuracy automated equipment like zero-tolerance grinding machines and high-temperature dryers to produce Snorkels that match global standards. Dalmia-OCL’s onsite R&D centre Dalmia Institute Scientific and Industrial Research (DISIR), will also help accelerate further innovations in refractory technology for clean steel production.

Defence Minister Rajnath Singh Inaugurates Sisseri River Bridge in Arunachal Pradesh

Informing about the event, Bharat Bhushan Babu, spokesperson, Ministry of Defence said, “The 200-metre long bridge between Jonai-Pasighat-Ranaghat-Roing road will provide connectivity between Dibang Valley and Siang to meet the long-pending demand of the people of Arunachal Pradesh as it would cut down the travel time from Pasighat to Roing by about five hours.”

India to Cross 200 GW Renewable Energy Capacity Mark by 2022

“The renewable energy capacity which has been installed is 83 GW and under installation is 31 GW and 35 GW capacity is underbidding. So this becomes around 140-145 GW. In hydro, we have installed capacity of around 45 GW and under installation capacity is about 13 GW, which makes it (hydro) around 60 GW. So we will cross 200 GW capacity of renewable energy by 2022,” the minister said. Singh said that more than 55 per cent of installed power generation in India will be from renewable sources by 2030.

Environment Clearance to IOCL to Set Up New 2G Ethanol Plant at Panipat

IOCL had earlier submitted a proposal seeking Environmental Clearance for its proposed 100 KLPD Ligno-Cellulosic 2G Ethanol Plant in Baholi, Panipat district of Haryana. The estimated investment in setting up the plant is Rs 766 crore (US$ 109.60 million). It is noteworthy to mention that Central Government has identified production and use of ethanol as one the thrust area to reduce import dependency and increase farmers’ income. The Ethanol produced will be used for blending in transportation fuel.

Categories