Kautilya

Last Bodo Militant Group Leaves Myanmar, Surrenders to Indian Authorities

Security sources said that 50 heavily armed cadres of the group led by its chairman B Saoraigwra have surrendered a large cache of weapons and have been brought to Guwahati. The return of the last group of Bodo militants is a result of an initiative by chief administrator of Bodoland Territorial Council (BTC), Hagrama Mahilary and joint efforts of Indian and Myanmar authorities.

Two Coast Guard Ships Commissioned at Kolkata – Make in India

Both ships are 48.9 metres long and 7.5 metres wide, with a displacement of 308 tonnes. The ships are capable of achieving a maximum speed of 34 knots, powered with MTU 4000 series engines and propelled by three 71S type III Kamewa water jets by Rolls Royce. The ships are also capable of undertaking multi-faceted tasks such as surveillance, interdiction, search and rescue, and medical evacuation.

J&K Sovereign Part of India, Pakistan Should Vacate PoK: British MP

“The entirety of the state of Jammu and Kashmir is part of sovereign India, and people that ask for UN resolution to be implemented ignore the first resolution, which is that Pakistani military forces should leave Kashmir to re-unite the state,” Blackman said at the “Balidan Divas” or Day of Sacrifice event held in London.

6 Apache Attack Choppers to be Deployed on Pakistan Border

Army chief General Manoj Mukund Naravane on Saturday announced that six Army Apache attack helicopters would be deployed on the Pakistan borders to help the Indian security forces personnel stationed there. The Army chief further said that the choppers would be deployed at locations where there is a threat of armoured columns.

Gaganyaan to be Tested in Wind Tunnel Facility of CSIR Laboratory

“The mission is complex and needs collaboration between CSIR, Indian Space Research Organisation (ISRO) and Defence Research and Development Organisation (DRDO) for achieving the objective. CSIR will play a vital role in design of the space shuttle which will be tested in the wind tunnel facility at NAL,” said the DG CSIR.

Yerraguntla Section in Declared as the First Solar Section in South Central Railway

Indian Railways has planned to source about 1000 Mega Watt (MW) Solar Power and about 200 MW of wind power progressively by 2021-22 across Zonal Railways & Production Units. Of this, 500 Mega Watt (MW) solar plants are to be installed on the roof top of Railway buildings which will be used to meet non-traction loads at Railway Stations, etc. About 500 MW land based solar plants will be used to meet both traction & non-traction requirements.