A total of 322 projects in a length of 12,413 Km have been awarded under Bharatmala Pariyojana till August, 2020. Further, 2921 Km has been constructed under the Project till the same date.
The Ministry of Road Transport and Highways has taken up detailed review of NHs network and has given overall investment approval for Bharatmala Pariyojana Phase I Scheme for development of about 34,800 km (including 10,000 Km residual NHDP stretches) at an estimated outlay of Rs 5,35,000 Crore.
Bharatmala Pariyojana is an umbrella program for the highways sector that focuses on optimizing efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps through effective interventions like development of Economic Corridors, Inter Corridors and Feeder Routes, National Corridor Efficiency Improvement, Border and International connectivity roads, Coastal and Port connectivity roads and Green-field expressways.
Source: PIB
You may also like
-
BCCL Dispatches First Rake From 5-MTPA Maheshpur Rapid Loading System
-
India’s Steel-Slag Road Technology Moves From Research to Large-Scale Infrastructure Deployment
-
Why India Wants to Own the Technologies That Shape the Future
-
Tata Electronics Brings Malaysia’s Kelington Into Dholera Fab as India–Malaysia Semiconductor Links Deepen
-
BARC Moves Bharat Small Modular Reactor Towards Industry-Led Deployment