Integral Coach Factory (ICF) of Indian Railways has produced its 3000th coach of the year in less than nine months.
This would help in meeting the growing demand for coaches. The number of working days to achieve the above figure has been reduced from 289 days in the last year to 215 days in the current year.
AIR correspondent reports, till the year 2014, the same amount of time was being taken for the production of only 1000 coaches.
Source: News On Air
Image Courtesy: FactsnPictures
You may also like
-
India’s Renewable Energy Capacity Expands as Solar Power Reaches 175 GW and Wind Power Crosses 59 GW
-
India Advances ₹68,816 Crore Ultra-High-Voltage Transmission Corridor to Strengthen National Power Grid
-
India’s Exports Rise 16.66% to $568.84 Billion During April–October 2026–27
-
PM Modi Inaugurates India’s First LED Dome Planetarium at Mysuru
-
Lakadong Turmeric of Meghalaya: The GI-Tagged Heritage of the Jaintia Hills’ Golden Spice